The State Highway Administration’s Office of Structures, as a part of the State’s Bridge Preservation Program, will have a contractor performing routine maintenance operations on The Chestertown Drawbridge, MD 213 over Chester River, on Monday, February 19, 2018.
Work will be done from 9am -3pm and may consist of test openings of the bridge that should last no longer than those needed for an average vessel’s passage.